GENERAL DESCRIPTION: This renewal of the Cogeneration HRSG (Heat Recovery Steam Generator, 28,000 PPH) is the focus of this project. the HRSG will be re-tubed, water column, feed water level control valve, and non-return valves will be replaced. The economizer will also be replaced as part of the project along with Feed Water Pumps #1 & #2.
DESIGN TEAM:
Engineer: Burns Engineering, Inc.
TCNJ Design Manager: Dave Matlack
TCNJ Construction Manager: TBD
CURRENT STATUS: Bid documents are expected to be issued in summer 2018, for a summer 2019 installation.