Boiler # 1 Renewal

GENERAL DESCRIPTION: This project will replace existing boiler (circa 1962) with a new boiler, stack economizer and replacement of two blowdown tanks.

DESIGN TEAM:

  • Engineer: DLB Associates
  • TCNJ Design Manager: Dave Matlack
  • TCNJ Construction Manager: Matt Bonomo
    CURRENT STATUS: This project is inĀ  construction.