GENERAL DESCRIPTION: This project will replace existing boiler (circa 1962) with a new boiler, stack economizer and replacement of two blowdown tanks.
DESIGN TEAM:
- Engineer: DLB Associates
- TCNJ Design Manager: Dave Matlack
- TCNJ Construction Manager: Matt Bonomo
- CONTRACTOR: Liberty Mechanical Contractors, Inc.
CURRENT STATUS: This project is in close out.