GENERAL DESCRIPTION: This project will replace 18 existing fire pumps across campus with two new campus fire pumps. Reducing the number of fire pumps on campus will reduce maintenance and testing efforts.
DESIGN TEAM:
- CONSULTANT: Hughes Associates
- TCNJ DESIGN MANAGER: Dave Matlack
- TCNJ CONSTRUCTION MANAGER: Matt Bonomo
- CONTRACTOR: Framen Mechanical Contractors, Inc.
CURRENT STATUS: This project is in construction.