GENERAL DESCRIPTION: This project will replace the flat roof and the HVAC equipment at Forcina Hall.
DESIGN TEAM:
- ENGINEER: DLB Associates
- TCNJ DESIGN MANAGER: Dave Matlack
- TCNJ CONSTRUCTION MANAGER: TBD
CURRENT STATUS: This project is in the construction documents phase. Bid documents are expected to be posted in June 2018 at https://bids.tcnj.edu/home/construction-projects/