Cogen Controls Update

GENERAL DESCRIPTION: This project will replace the existing controls for the power plant cogeneration turbine, which are at the end of their life cycle, with new controls, provide remote desktop display of control information, replace existing oil coolers, and upgrade the existing fire and gas detection system.

DESIGN TEAM:

Engineer: Burns Engineering, Inc.
TCNJ Design Manager: Dave Matlack
TCNJ Construction Manager: Dave Jurkin

CURRENT STATUS: This project is in construction.